欢迎来到课桌文档! | 帮助中心 课桌文档-建筑工程资料库
课桌文档
全部分类
  • 党建之窗>
  • 感悟体会>
  • 百家争鸣>
  • 教育整顿>
  • 文笔提升>
  • 热门分类>
  • 计划总结>
  • 致辞演讲>
  • 在线阅读>
  • ImageVerifierCode 换一换
    首页 课桌文档 > 资源分类 > DOCX文档下载  

    伊拉克四人吊厢旅游索道 规章制度.docx

    • 资源ID:290904       资源大小:27.63KB        全文页数:20页
    • 资源格式: DOCX        下载积分:5金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要5金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    伊拉克四人吊厢旅游索道 规章制度.docx

    Rules and Regulations forOperation of Iraq Ropeway with 4-Seat Suspended Cages伊拉克四人吊厢旅游索道规章制度Rules for Civilized Service1. Standard for Service AttitudeLSet up tenet of tourists as king, safety first, courtesy, thoughtful and civilized service.2. Positively serve tourists, and try best to satisfy their reasonable and normal requirements.3. Kindly talk to tourists, do not treat them rudely or differentially.4. Strictly observe standard service procedure, making tourists enjoy the same quality service all the time.5. Surely be responsible for tourists, provide quality service for tourists and put enterprise goodwill at the upmost place.II. Standard for Working Discipline1. Take duty and post punctually, do not leave, do not be late, do not leave early without excuse, and do not be absent from work.2. Do not chat with each other, or do private things, or eat snacks, or do other things than work during service time.3. Do not yell or sing; do not behave badly in customer's service during service time.4. Cherish equipment and facilities in the scenic spot; do not operate or move or damage them at will.5. Hand over articles and money you pick up promptly to office, but do not pocket them privately.6. Do not receive your private guests or telephone calls; do not come to work with your kids.7. Do not bring your private friends to the scenic spot without leader's approval.8. All the staff shall not drive any motor cars in the scenic area during working time.Fundamental Work for Ropeway Station Safety ManagementI. One Policy: Insist on ttSafety First, Prevention PrimaryIn case there is any conflict between operation and safety, safety shall take precedence.II. Two Basic Points: Leaders shall not direct and staff shall not operate by breaking rules and regulations.III. Three Links: Electro-mechanical repairmen shall insist 'Three Checks,(i.e., early check before operation, tour check during operation and late check after operation), and uThree No-Releases,(i.e., unclear accident causes are not released, indefinite accident responsibilities are not released, unprepared measures against accident recurrence are not released). By three levels of maintenance (i.e., routine maintenance, Level I maintenance and Level II maintenance), implement ttThree Good COnditiOns” (Equipment are managed, operated and repaired properly).IV. Four Skills: Operators shall try best to study professional knowledge, and must reach tTour SkiHs,5 (i.e., operation, servicing, check and troubleshooting).V. 44Five Simultaneous Items”: Attach great importance to safety management, and practice safety work simultaneously in five aspects (i.e., plan, arrangement, check, summary and evaluation).VI. "Six Insistences,1. Insist that starting and stopping of operation shall be signed by stationmaster.2. Insist that after electro-mechanical equipment are checked, serviced and maintained and while equipment are operating, corresponding persons shall “log in“ corresponding forms.3. During ropeway operation, staff shall be “on duty“ on all posts.4. After ropeway stops operation, maintenance persons shall check ropeway thoroughly and perform spot “maintenance”.5. Insist regular “check” and irregular check as per Procedure for Daily Check, Monthly Check and Annual Check.6. Insist flaw detection of wire rope, cage and rope clip once a year.Stationmaster Post Responsibility1. Carefully carry through national polices, laws, statutes and corporation-issued regulations.2. Under corporation leader5ship, be responsible for overall operation in his own station, organize and implement corporation resolutions, report work and provide advice to corporation management, fully operate overall work in his own department.3. Organize and decide operation and human resource management in his own unit generally.4. Preside to formulate development planning and operation policy, to prepare annual plan and annual summary.5. Convene operation meeting and technical safety meeting, listen to discussion, decide related major issues and master operation status and various changes in his own unit.6. Listen to comments and advice from staff, maintain legitimate rights and interests for staff, care and improve staff material and cultural lives, and improve staff quality.7. Approve and sign internal and external reports and documents.8. Be dutiful to corporation, and complete work and tasks arranged by corporation.Driver Post Responsibility1. Love work post, obey dispatch and observe work discipline.2. Strictly execute ropeway safety technical operation procedure, job procedure; closely cooperate with electrical and mechanical repairmen.3. Before electrical and mechanical equipment repair starts, start and slop communication signa must be sent to the other party. Ropeway shall not be started or stopped until feedback signal is received.4. Carefully observe electrical equipment in control room and closely check if indications on instruments are normal, and report abnormality instantly if any.5. Closely observe safely of tourists on get-down platform.6. Carefully fill-in check records, go through signing procedure. Do never start operation without stationmaster (vice stationmaster) signature.7. Maintain environmental sanitation and keep control room clean.8. Study hard professional technology, test three continuities (phone call, WaIky-Ullky and broadcast), three normalizations (manual, principal machine and auxiliary machine); report in time failure if any.Booking Clerk Responsibility1. Firmly set up idea of tourists first, hold kind attitude to passengers, provide warm service, answer patiently questions from passengers, and correctly use civilized words.2. Observe rules and regulations and strictly observe work and rest schedule.3. Stick to work post, do not leave off work post, and do not do anything unrelated to work.4. Be familiar with service, strictly manage ticket money, prohibit to trust others to sell tickets and manage ticket money , do no( provide invoice or mark up ticket unlawfully at his/her own discretion or defalcate.5. No persons other than staff are allowed to enter booking office. Ticket shall not be sold to ones who do not meet conditions stipulated in Instructions to Tourists to avoid unexpected events.Electrician Responsibility1. Love work post and observe work discipline.2. Strictly execute technical safety operation procedure, eradicate occurrence of all accidents.3. Carefully check electrical equipment, keep them in good condition and guarantee safe ropeway operation.4. Persons on-duty shall be loyal to posts, do not leave off, monitor electrical equipment operation conditions. In case safety is jeopardized, he/she shall have power to stop operation and then report.5. Be familiar with technical performances, structure, driving principle and failure causes of electrical equipment, and master treating methods.6. Carefully write check records and go through signing procedure.Station Clerk Responsibility1. Love work post, obey dispatch and observe work discipline.2. Wear neatly, wear service badge, treat tourists kindly, use civilized wording and stand up during service time.3. Do not turn over cage fence rudely to guarantee tourist safely.4. Clean seats and backrests in cages during trial run before daily official operation.5. Be strictly sure not to omit any checks, not to leak any tickets and to be loyal to post.6. Carefully write shift record clearly, with detail contents.7. It shall be strictly inhibited to play, eat snacks or smoke cigarette in station.8. Before entering station, cages shall be aligned, not largely swinging right and left9. Keep environmental sanitation on station platform and keep surrounding environment clean all the time.Mechanic Post Responsibility1. Love work post and observe work discipline.2. Strictly execute technical safety operation procedure, eradicate occurrence of all accidents.3. Carefully check mechanical equipment, keep them in good condition and guarantee safe ropeway operation.4. Persons on-duty shall be loyal to posts, do not leave off, monitor mechanical equipment operation conditions. In case safety is jeopardized, he shall have power to stop operation and then report.5. Be familiar with technical performances, structure, driving principle and failure causes of mechanical equipment, and master treating methods.6. Carefully write check records and go through signing formalities.7. Keep environmental sanitation in equipment and machine rooms.8. Study hard and dive professional technology.Rescue Team Responsibility1. Firmly set up policy tlSafety Firsf, Love work post, observe work discipline and obey dispatch.2. Strictly perform technical safety operation procedure of ropeway. For accidental human injury during operation, take decisive measures, and closely cooperate with electrician and mechanic in rescue work.3. In case human injury accident happens during ropeway operation, rescue workers shall come to accident spot in no time, and move tourists to safe place at the fastest speed, shortest lime and highest efficiency.4. Rescue workers must heal the wounded and rescue the dying, perform humanism, correct rescue attitude, and serve tourists with whole heart.5. Insist concept prevention first, prevention and rescue combined, exercise rescue regularly and improve rescue quality.6. For major human injury accidents, must insist 44Three Musts“ principle, i.e., accident cause must be found out, person liable must be educated, and accident must be dealt with. Maintain accident site properly and report instantly.Safe Operation Committee Responsibility1. Organize and establish rules and regulations for safe operation, technical and safe operation procedure, supervise and urge implementation.2. Organize 3-level safety education of new workers, safety technology training of special trade workers, and education of workers who will take new posts and who were wounded and will return to work.3. Widely promote safety propaganda activity by using broadcast, wall paper, slogan, exhibition and bulletin, etc.4. Organize scheduled, specialized, seasonal and operational safety inspections, and urge correction of incipient faults.5. Organize annual plan for technical safety and measures, and urge implementation.6. Set up and approve labor protection appliance management and release standard.7. Prepare heatstroke prevention money release method, and do summer ttFour Preventions well.8. Organize safety operation competition, experience exchange and cite model workers.9. Be responsible for statistics, report and filing of incidents.10. Organize analysis, treatment and report of major injury events.Driver Operation Procedure1. Keep indoor clean, and check if electrical cabinet and console lock are normal.2. Preparation before operation: after power is supplied from sending end,1) open power distribution cabinet, set double-throw switch to designated power supply position, then close master air switch, check if “Power“ indicator on panel lights up, simultaneously check 44Vdltage Change-OVer“ switch, and check if voltages among three phases are balanced by using a volt-meter.2) Press ttPovver up“ button to feed power to master control cabinet and console.3) Close air switch in console to supply power to controls in console to protect power supply.a) Check if ropeway derail protection is normal, i.e., if the light comes on.b) Check if indication Ofhydraulic pipeline is normal.c) Check if indication for large carriage is normal; if not, by pressing ttTension StationActivation ,pushbutton, motor in hydraulic tension station drives hydraulic oil pressure to rise up, which drive cylinder to run small carriage. When pressure reaches preset position, motor stops, indicator for large carriage position becomes normal.d) Check if tong brake limit is normal; it is normal if indicator illuminates by turning 44Solenoid valve" knob, then return ttsolenoid ValVe“ Io original position and indicator extinguishes.e) After all are normal, turn switch to “Master machine,(to 44Auxiliary Machine“ if auxiliary machine is to be used).4) Close master air switch and all protective switches in master control cabinet.3. Operation1) Press “Master Machine Start“ pushbutton, release the tong brake, which shall make Brake Release indicator come on.2) By pressing “Electric Bel, pushbutton, electric bell in station shall ring up, which reminds tourists and staff in station of safety and ropeway start.3) By pressing t4Master machine Corotation“ pushbutton, ropeway accelerates smoothly at preset speed till running at a stable speed.4. StopBy pressing “Master Machine Stop“ pushbutton, control system automatically comes to reverse engagement state, speed reduces gradually. When speed approaches nearly to zero, motor power is off, and hydraulic push rod brake stops ropeway. In emergency, by pressing “Master Machine Emergency Stop“ pushbutton, all indicators for master machine status come off! Motor disconnects power, tong brake and hydraulic pushrod brake simultaneously apply, and ropeway stops urgently.Braking condition of auxiliary machine is same as above.Electro-Mechanical Maintenance Team ResponsibilityChapter I Coverage of Responsibilities1. Mechanical Maintenance is responsible for check, servicing and repair of the following items: a) Steel structure elements such as drive frame, bypass wheel column, supports. Pay close attention to displacement, deformation, weld crack, destructive vibration, fastener looseness, structural foundations. Be sure that distance between ropeways is identical everywhere and two ropeways are straight.b) Drive parts, such as reducer, joint, coupler, drive wheel, bypass wheel, cable support and press wheels. Pay close attention to temperature rise, noise, sound, wear so as to guarantee smooth operation.c) Running safety equipment, such as hydraulic tension, hydraulic pushrod brake and tong brake. Pay close attention to small carriage position, braking distance, and guarantee action is flexible and reliable.d) Wire rope, cable clip, and tourist cage facility. Pay close attention to rupture; weld break and fastener looseness to guarantee running safety.2. Electrical repair team shall be responsible for check, servicing and repair of the following items: a) Telephone, communication and broadcast circuits to guarantee their continuity during ropeway operation.b) Safety Protection Circuits (including U-shaped needle, up and down station emergency stop pushbuttons).c) Anemorumbometer.d) Hydraulic tension limit switch, primary and secondary motors, reducer, oil pump motor, electrical devices in hydraulic station and pushrod motor.Chapter II Inspections1. One hour before daily operation, thoroughly

    注意事项

    本文(伊拉克四人吊厢旅游索道 规章制度.docx)为本站会员(夺命阿水)主动上传,课桌文档仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知课桌文档(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-1

    经营许可证:宁B2-20210002

    宁公网安备 64010402000986号

    课桌文档
    收起
    展开