燃气轮机调试步骤.docx
GE燃气轮机调试ColdandhotcommissioningforGEGasTurbineframe9E:1- Recalibrateandrecheckthesetpointsforallinstrumentsinthesite.2- Makeloopcheck,functiontestforeachsystemtobeinsuredallsignalshealthyonHMI(MARKVie).3- Calibrateallvalveslike(VC3,IGVandratiovalvesforfuelgassystemetc).4- StartthecommissioningforunitfromcrankingtestuntilFSNLtest.5- Makesynchronizationtocheckthegenerator(excitation,generationandprotection)ColdandhotcommissioningPETROGASFuelGasSystem:1- Calibrateallinstrumentsandcheckthesetpoints.GE燃气轮机架冷热调试9E:1 重新校准并重新检查现场所有仪器的设定值。2-进行循环检查,对每个系统进行功能测试,以保证所有信号在HMl(MARKVIe)上都能正常运行。3-校准所有阀门,如(VC3,IGV和燃气系统比例阀等)。4 .启动调试到起动测试直到FSNL测试。5 .同步检查发电机(励磁,发电和保护)冷热调试PETROGAS燃气系统:1 校准所有仪器并检查设定值。2 监督相关匹配的安装。3-使用HMl进行接线连续性和回路检查所有信号(西门子步骤7)。4-调试所有平台(进口,过滤,冷凝水,计量,WBH,减压,电加热2-Supervisiontheinstallationwhich器,最后在GT双过滤)。shouldbematchedwithhookup.5、将中性气体进入气站直到GT。3-Makewiringcontinuityandloop6-设置不明确气体燃气轮机点火。checkforallsignalswithHMI(Siemensstep7).冷热调试CEMS(连续排放监测系4-Commissioningallskids(inlet,统):filtering,condensate,metering,I-检查接线和连续性测试。WBH,reducing,electricalheaterand2.校准并检查仪器的设定点。finallydoublefilteratGT).3配置与数据表匹配的所有设备。5-Intertheneutralgasintogas4启动系统并开始检查测量。stationuntilGT's.6-Makefiringforgasturbinebyneutralgas.ColdandhotcommissioningCEMS(ContinuousEmissionsMonitoringSystem):1-Checkwiringandcontinuitytest.2-Calibrateandchecksetpointsofinstruments.3-Configurealldeviceswhichmatchedwithdatasheet.4-Powerupthesystemandstartcheckthemeasuring.