重庆某化工项目钢筋焊接施工方案(中英文对照).doc
《重庆某化工项目钢筋焊接施工方案(中英文对照).doc》由会员分享,可在线阅读,更多相关《重庆某化工项目钢筋焊接施工方案(中英文对照).doc(59页珍藏版)》请在课桌文档上搜索。
1、钢筋焊接施工方案文件编号: Approved: 批 准: Audit: 审 核: Fabrication: 编 制: Contents 目录一、 Project overview.1-3二、 Fabrication basis编制依据.3-3三、Application scope适用范围.3-3四、Manual electric arc welding手工电弧焊.4-9五、 Flash butt welding闪光对焊.9-13六、Reinforcing steel electroslag pressure welding钢筋电渣压力焊14-15七、Safety attentions安全注意事
2、项.16-16一、 Project overview工程综述: This project is Linde Huayi(Chongqing) Gases Co., Ltd 1 Billion Nm3/year Syngas CO/H2 project, located in Chongqing(Changshou) Chemical Industry Park, and the main work contains substation、office、parts stock、pressure swing adsorption unit, MDEA washing unit 1, MEDA wa
3、shing unit 2, high temperature shift unit, feed gas compression unit 1,feed gas compression unit 2,DEOXO unit 1,DEOXO unit 2, temperature swing adsorption unit 1, temperature swing adsorption unit 2, cold box 1, cold box 2, compression unit 1,compression unit 2, compression unit. The foundation bed
4、is C15 concrete; the unit foundation is using C30 concrete. Together with concrete roads, a total of about 20000 party site concrete.本项目为林德化医(重庆)气体有限公司10 亿Nm3/年合成气制备CO/H2 项目,位于重庆(长寿)化工园区内, 其中主体工作包括变电所、办公楼、备件仓库、变压吸附单元、MDEA洗涤单元1、 MEDA洗涤单元2、高温变换单元、原料气压缩单元1、原料气压缩单元2、DEOXO单元1、DEOXO单元2、变温吸附单元1、变温吸附单元2、冷箱单
5、元1、冷箱单元2、压缩单元1、压缩单元2、压缩单元。基础垫层C15混凝土,单元基础采用C30混凝土。加之混凝土道路等,现场混凝土总量约20000方。The unit equipment district covers an area of, equipment foundation, on the welding requirement of reinforcing steel joint is high. In order to ensure the construction safety、quality、high efficiency and especially the preparat
6、ion of the scheme.本单元设备装置区占地面积大,设备基础多,对钢筋接头焊接要求高。为保证施工安全、优质、高效完成,特编制本方案。二、Fabrication basis编制依据:Related construction drawing and design requirement相关施工图纸及设计要求Reinforcing steel welding and acceptance specificationJGJ18-2012钢筋焊接及验收规程JGJ18-2012 Technical specification of reinforcing steel mechanicalJGJ
7、107-2010钢筋机械连接技术规程JGJ107-2010Upsetting straight thread reinforcing steel jointJGJ71-2005镦粗直螺纹钢筋接头JGJ71-2005三、Application scope适用范围:Reinforcing steel connection shall adopt binding、mechanical and welding. Foundation raft board and beam steel shall adopt manual electric arc welding、flash butt welding;
8、 And the column and bar shall adopt electroslag pressure welding.本工程钢筋连接采用绑扎连接、机械连接和焊接。基础筏板、梁钢筋采用手工电弧焊、闪光对焊;柱筋采用电渣压力焊。四、手工电弧焊: 4.1、Construction preparation施工准备: 4.1.1、Material and main tools材料及主要机具: 4. 1.1.1 Reinforcing steel: the grade and diameter of reinforcing steel shall meet the design require
9、ment, and have merchandise certification and retest report. The imported bar also shall have chemistry retest report, chemical composition shall meet welding requirement, and the solderability test. The anchor fluke of embedded parts shall adopt I、II grade bar, which shall not old rusty and greasy o
10、il.钢筋:钢筋的级别、直径必须符合设计要求,有出厂证明书及复试报告单。进口钢筋还应有化学复试单,其化学成分应满足焊接要求,并应有可焊性实验。预埋件的锚爪应用、级钢筋。钢筋应无老锈和油污。 4. 1.1.2 Steel products: the steel products of embedded parts shall not crack、corrosion、cicatrix、deformation, and its cross dimensions and mechanical properties shall meet design requirement.钢材:预埋件的钢材不得有裂缝
11、、锈蚀、瘢痕、变形,其断面尺寸和机械性能应符合设计要求。 4. 1.1.3 Welding rod: welding rod brand shall meet design regulation. If no regulation in design, it shall meet following requirement and the quality of welding rod also shall meet following requirement:焊条:焊条的牌号应符合设计规定。如设计无规定时,应符合下表的要求,焊条质量应符合以下要求:The welding rod brand o
12、f reinforcing steel electric arc welding 钢筋电弧焊使用的焊条牌号Item项次Bar grade钢筋级别Overlap welding、 ligating bud welding搭接焊、帮条焊Groove welding坡口焊1级E4303 E4303E43032级E4303 E4303E50033级E5003 E5003E50034、级与钢板焊接E4303E4303 4.1.1.3.1 The welding rod coating surface shall not crack、pore and irregularity defects, and n
13、ot with the naked eye can see that the eccentricity.焊条药皮表面应无裂缝、气孔、凹凸不平等缺陷,并不得有肉眼看得出的偏心度。 4.1.1.3.2 During welding, the electric arc shall combustion stability, coating uniform melting and without blocking drop phenomenon.焊接过程中,电弧应燃烧稳定,药皮熔化均匀,无成块脱落现象。 4.1.1.3.3 Welding rod must accord to requirement
14、of welding rod instructions to stoving, and then using.焊条必须根据焊条说明书的要求烘干后才能使用。 4.1.1.3.4 Welding rod must have merchandise certification and batch number.焊条必须有出厂合格证、批号。 4.1.1.4 Arc welding machine、welding cable tray、electric welding pliers、helmet、chipper、wire brush、file、hammer and angle grinder etc.弧
15、焊机、焊接电缆、电焊钳、面罩、堑子、钢丝刷、锉刀、榔头、角磨机等。 4.1.2、Work conditions作业条件: 4.1.2.1 Welder must have welder certification (original copy).焊工必须持有焊工证(原件)。 4.1.2.2 The steel bar ligating bud welding size、crevasse angle、reinforcing steel termination clearance、joint position and reinforcing steel axis shall meet regula
16、tion.帮条尺寸、破口角度、钢筋端头间隙、接头位置以及钢筋轴线应符合规定。 4.1.2.3 Power source shall meet requirement.电源应符合要求。 4.1.2.4 Working site shall have safety protection facilities、fireproof and necessary ventilation system, to avoid the occurrence of burn、shock、poisoning and fire accidents.作业场地要有安全防护设施、防火和必要的通风措施,防止发生烧伤、触电、中毒
17、及火灾等事故。 4.1.2.5 Familiarity with drawing, do well technical disclosure.熟悉图纸,做好技术交底。4.2、Operation process操作工艺: 4.2.1 Process procedure工艺流程:Determine welding parameter 确定焊接参数Send samples送试Inspect equipment检查设备Select welding parameter选择焊接参数Test welding work, test piece试焊接作业试件Quality inspection 质量检验Star
18、t welding施焊4.22 Check power source、welding machine and tools. Welding machine grounding wire shall reinforce with good contact, to prevent arcing and burn reinforcing steel.检查电源、焊机及工具。焊机地线应与钢筋接触良好,防止因起弧而烧伤钢筋。4.2.3 Select welding parameters. According to the rebar grade、diameter、 joint type and weld
19、location, select the appropriate electrode diameter、welding layer and welding power source, ensure the welding seam and the steel has good fusion.选择焊接参数。根据钢筋级别、直径、接头型式和焊接位置,选择适宜的焊条直径、焊接层数和焊接电源,保证焊缝与钢筋熔合良好。4.2.4 Welding test、simulation test. Before each batch of reinforcing steel formally welding, it
20、 shall be weld 3 simulated specimens by tension test, after the test, then can be batch production according to the determined welding parameters.试焊、做模拟试件。在每批钢筋正式焊接前,应焊接3个模拟试件做拉力试验,经试验合格后,方可按确定的焊接参数成批生产。 4.2.5 Start welding operation施焊操作:4.2.5.1 Arc strike: with shim plate or steel bar ligating bud
21、welding joints, arc shall be on the steel plate or steel bar ligating bud welding to carry out. Without reinforcing steel shim plate or steel bar ligating bud welding of the joint, arc strike shall be at position that formed welding seam, to prevent burns main reinforcement.引弧:带有垫板或帮条的接头,引弧应在钢板或帮条上进
22、行。无钢筋垫板或无帮条的接头,引弧应在形成焊缝的部位,防止烧伤主筋。 4.2.5.2 Location: when welding, it shall first weld anchor point then start welding.定位:焊接时应先焊定位点再施焊。4.2.5.3 Arc manipulation: when arc manipulation, the straight forward、lateral run out and feeding welding rod three action shall coordinate smooth.运条:运条时的直线前进、横向摆动和送
23、进焊条三个动作要协调平稳。 4.2.5.4 Put out arc: when put out electric arc and pull out, molten pool shall be filled with, pay attention not on the work surface by arc scratch. 收弧:收弧时,应将熔池填满,拉灭电弧时,应将熔池填满,注意不要在工作表面造成电弧擦伤。 4.2.5.5 Multi-layer welding: if reinforcing steel diameter larger, it shall need for multi-la
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 重庆 化工 项目 钢筋 焊接 施工 方案 中英文 对照
链接地址:https://www.desk33.com/p-1288182.html