干灰散装机说明书.doc
《干灰散装机说明书.doc》由会员分享,可在线阅读,更多相关《干灰散装机说明书.doc(10页珍藏版)》请在课桌文档上搜索。
1、SZJ-100 型干灰散装机SZJ-100 Model Dry Dust Bulk Machine使用说明书Operation Instruction某某国能环保设备Jiangsu Guoneng Environment Protection Equipment Co., Ltd.一、前言1. Foreword 本产品适用于电力、建材、冶金、煤炭以与化工等其它行业的无腐蚀、低研磨性粉粒状物料的装车或装船作业。在火力发电厂主要用于灰斗或贮灰库下装车、装船。本产品可与料库下给料设施联锁运行,通过控制系统的控制,实现了装卸过程的自动化。其装车效率高,密封性能好,无粉尘污染。是散装粉状物料装车、装船的
2、理想设备。The product is applicable to the loading or shipment work of non-corrosion, low abrasiveness powder materials in such industry as power, construction, metallurgy, coal and chemical industry. If it uses in thermal power plant, it is mainly applied to the loading, shipping under dust hopper or du
3、st bunker. The product is interlocking operated with material storage feeding facility, to carry out automatic loading and unloading process via control system. It is the ideal equipment for loading and shipping bulk powder materials with such characteristics as high efficiency loading, good sealing
4、 performance and without dust contamination.二、技术参数2. Technical parameters2.1干灰散装机型号含义:结构形式 I:不带轴尘风机 II:带抽尘风机 III:带就地除尘器Structural form I: without dust exhaust fanII: with dust exhaust fanIII: with in site dust collector2.1 Model and signification of dry dust bulk machine:SZJ 100 Structural form I: w
5、ithoutdust exhaust fan II: with dust exhaust fan III: with in site dust collector出力100m3/hOutput 100m3/h干灰散装机Dry dust bulk machine2.2控制方式:设半自动和自动2.2 Control mode: setting semi-automatic and automatic2.3散装头升降行程:1300mm亦可按用户需要而定2.3 Lifting stroke of bulk head: 1300mm (decided as per users demand)2.5配带升
6、降电动机参数:2.5 Lifting motor parameters:型号:YEJ 90S 6 Model: YEJ 90S 6 电压:380V Voltage: 380V转速:910 r/min Rotating speed: 910 r/min2.6减速机参数:2.6 Reducer parameters: Model: WHT08-VII型号:WHT08-VII Reduction ratio: 1:63减速比:1:632.7抽尘风机参数:2.7 Dust exhaust fan parameters: 流量:2817m3/h Flow rate: 2817m3/h流量:2930m3/
7、hFlow rate: 2930m3/h 抽尘风机电机型号:Y112M-2 Motor model of dust exhaust fan: Y112M-2抽尘风机电机型号:Y100L-2Motor model of dust exhaust fan: Y100L-2 Motor power of dust exhaust fanMotor power of dust exhaust fan 抽尘风机电机电压:380V Motor voltage of dust exhaust fan: 380V抽尘风机电机电压:380VMotor voltage of dust exhaust fan: 3
8、80V 抽尘风机电机转速:2890r/min Rotating speed of motor of dust exhaust fan: 2890r/min抽尘风机电机转速:2870r/minRotating speed of motor of dust exhaust fan: 2870r/min2.8料位计形式:电容式料位开关2.8 Material level meter type: capacitance type level switch2.9料位计型号:TLK-C15A1-4C2.9 Material level meter model: TLK-C15A1-4C2.10散装机下料管
9、直径:3502.10 Diameter of blanking tube of bulk machine: 3502.11散装机吸尘管直径:5582.11 Diameter of dust suction pipe of bulk machine: 558注:带为III型散装机参数。Note: indicates the parameters of III model bulk machine.三、结构与工作原理3. Structure and working principle3.1 Main structure3.1.1 Extensional bulk head 散装头由底座、伸缩管、吸
10、尘管、套箍、钢丝绳、绳卡等主要部件组成,通过吸尘管、钢丝绳把它们连接起来,形成可伸缩的结构。Bulk head is posed of base frame, extension tube, dust suction pipe, hoop, steel cable, cable head, etc., which are connected by dust suction pipe and steel cable to form an extensional structure.3.1.2 Hoisting unit 卷扬装置由电动机、减速机带有计数器、滑轮装配、钢丝绳等组成,它是控制散装头伸
11、缩的装置。Hoistingunit is posed of motor, reducer (with counter), pulley assembly, steel cable, etc. It is the unit for controlling the extension of bulk head.3.1.3 Control system 控制系统是散装机的心脏,直接完成散装机整个卸料过程。它由控制拒、计数器、接近开关以与料位计、支架、电线等元件组成。计数器和接近开关控制散装头的下降位置,通过反应信号打开给料机和抽尘风机,散装机进展装料;料位计控制料位的上下,当料位达到指定位置后,它反
12、应给控制系统电信号,使控制系统关闭给料机和抽尘风机,并打开卷扬电机,提升散装头;同时计数器控制散装头的上升位置,当散装头接近预定位置时,关闭卷扬电机,从而完成物料的装卸。本控制系统设有“自动、手动操作切换开关,手动操作供检修与特殊情况下使用。Control system is the core of bulk machine, which may plete full unloading process of bulk machine. It consists of control cabinet, counter, approach switch and material level met
13、er, support, wires. The counter and approach switch are to control the descending position of bulk head, start feeder and dust exhaust fan through feedback signal, then bulk machine carries out loading; the material level meter controls the height of material level. When the level is up to the speci
14、fied position, it will feed back an electrical signal to control system so that the control system may close the feeder and dust exhaust fan, and start hoisting motor to lift bulk head; meanwhile, the counter controls the lifting position of bulk head, when bulk head approaches the presetting positi
15、on, close hoisting motor so as to plete the unloading of materials. The control system has “automatic, manual operation to change over the switches. The manual operation is only for inspection and special situations.3.1.4 Pulsed dust collector III型散装机自带一就地DMC型电脉冲除尘器,由抽尘风机、喷吹系统、箱体和滤袋组成。箱体设有吸尘口,把从散装机吸
16、来的含尘气体经滤袋后得到净化,净化后的气体经由抽尘风机出风口排空,滞阻在滤袋外壁的灰尘经由喷吹系统循环处理以后被去除。这样一来,现场可实现无尘作业。III model bulk machine has an in site DMC electrical pulsed dust collector, which is posed of dust exhaust fan, blowing system, tank and filter bag. The tank has a dust suction inlet to purify the dusty gas absorbed from bulk
17、machine via filter bag, then empty the purified gas via the air outlet of dust exhaust fan, remove the dust retained at external wall of filter bag bycircular processing of blowing system, so that the site can carry out dust free work.3.2 Working principle 当散装头锥面下降到与汽车或船入灰口上部密合时,钢丝绳变松,计数器上的到位开关发出电信号
18、反应给控制系统,关闭卷扬电机,并打开抽尘风机和给料机,开始装料;当物料装满料罐时,料位计发出信号,反应给控制系统,控制系统自动关闭给料机和抽尘风机并提升散装头;当散装头提升到预定位置时,计数器上的到位开关发出电信号,反应给控制系统,自动关闭卷扬电机,完成一次物料的装卸过程。When the conical surface of bulk head descends to be sealed together with the top of dust inlet of vehicle (or ship), the steel cable will be loose, the limit swit
19、ch on the counter sends out an electrical signal to feed back to control system, close hoisting motor and start dust exhaust fan and feeder, then start loading; when material tank is full of materials, the material level meter will send out a signal to feed back to control system, then control syste
20、m automatically closes feeder and dust exhaust fan as well as lift bulk head; when bulk head is lifted at presetting position, the limit switch on the counter will send out an electrical signal to feed back to control system, then hoisting motor is automatically closed so that a pleted material load
21、ing and unloading process is finished.四、安装、调试与运行4. Installation, missioning and operation4.1 Installation4.1.1设备到现场后,先整体检查,看有无因运输而损坏部件的情况,如有,如此应拆卸更换;4.1.1 Check if any part is damaged due to transportation, after the equipments are arrived at the site, if any, it should be removed and replaced;4.1.2
22、然后吊装散装机并与预留孔对位;对好位后,按现场管道情况把散装头底座与预埋件用螺栓联结好也可直接焊接。安装过程中注意不要刺破或烧伤吸尘管挂胶帆布,以免影响吸尘管的透气性。4.1.2 Lift the bulk machine and direct to preserved hole; after positioning, connect the base frame of bulk head with pre-embedded parts by bolts (or welding) according to the piping in site. During installation, not
23、ice that do not break or burn the dust suction pipes (rubberized canvas) so as not to affect the air permeability of dust suction pipes.4.1.3按电气图纸资料连接电缆,并注意各电缆的走向。4.1.3 Connect cables according to electrical drawing and pay attention to the direction of each cable.4.2 missioning4.2.1 No-load mission
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 散装 说明书

链接地址:https://www.desk33.com/p-16437.html