主线桥梁承台基坑钢板桩支护设计计算书.docx
《主线桥梁承台基坑钢板桩支护设计计算书.docx》由会员分享,可在线阅读,更多相关《主线桥梁承台基坑钢板桩支护设计计算书.docx(28页珍藏版)》请在课桌文档上搜索。
1、主线桥梁承台基坑钢板桩支护设计计算书1 .主线桥梁承台基坑支护布置方案根据本工程桥梁承台所处地质环境及施工特点:主线桥梁墩台基本上均位于滩涂及水塘内,其墩位处水位地质情况为九龙江北港河床底标高为-6.5m,潮水位为-1.6m4.5m,承台基底土质主要以淤泥质土为主,最深厚度达到7.2m。主线桥梁所有承台均采用拉森IV型钢板桩作为承台基坑支护,当基坑深度小于5m时不考虑设置钢板桩内支撑,基坑深度在5m-8m之间时将设置两层由136b工字钢作为钢板桩内支撑。承台基坑钢板桩支护范围按照承台四个边各扩大1.5m控制。钢板桩围堰插打时按照高出最高洪水位0.5r进行控制。本工程所采用拉森IV型钢板参数表根
2、据对不同深度的承台基坑支护进行验算,本工程拉森IV型钢板桩选用长度分别为9m、12m、15m、18m,共计4种。本工程钢板桩数量表桥墩承台开挖承台尺寸基坑开挖基坑单根钢板梁号深度(m)(m)尺寸(m)周长钢板桩根名称(m)桩长度(m)数(根)南n大桥左主线桥0#2.6446.4m*18m9.4m*21m60.8091521#1.4096.5m*6.5m9.5m*9.5m38.009952#6.7696.5m*6.5m9.5m*9.5m38.0018953#3.7406.5m*6.5m9.5m*9.5m38.0012954#2.6956.5m*6.5m9.5m*9.5m38.009955#7.7
3、346.5m*6.5m9.5m*9.5m38.0018956#5.8486.5m*6.5m9.5m*9.5m38.0015957#3.1916.5m*6.5m9.5m*9.5m38.0012958#2.1786.5m*6.5m9.5m*9.5m38.009959#3.1926.5m*6.5m9.5m*9.5m38.00129510#1.4656.5m*6.5m9.5m*9.5m38.0099511#2.6176.4m*18m9.4m*21m60.809152南11大桥左辅道桥0#2.3346.4m*17m9.4m*20m58.8091471#4.0896.5m*6.5m9.5m*9.5m38.
4、0012952#2.9496.5m*6.5m9.5m*9.5m38.009953#3.4206.5m*6.5m9.5m*9.5m38.0012954#1.8756.5m*6.5m9.5m*9.5m38.009955#4.9146.5m*6.5m9.5m*9.5m38.0015956#7.5286.5m*6.5m9.5m*9.5m38.0018957#2.8716.5m*6.5m9.5m*9.5m38.009958#1.8586.5m*6.5m9.5m*9.5m38.009959#2.8726.5m*6.5m9.5m*9.5m38.0099510#1.6456.5m*6.5m9.5m*9.5m3
5、8.0099511#2.3076.4m*17m9.4m*20m58.809147南n大桥右主线桥0#2.3496.4m*17m9.4m*20m58.8091471#2.7796.5m*6.5m9.5m*9.5m38.009952#2.6396.5m*6.5m9.5m*9.5m38.009953#3.1106.5m*6.5m9.5m*9.5m38.0012954#2.5656.5m*6.5m9.5m*9.5m38.009955#3.1046.5m*6.5m9.5m*9.5m38.0012956#5.2186.5m*6.5m9.5m*9.5m38.0015957#1.5616.5m*6.5m9.5
6、m*9.5m38.009958#2.0486.5m*6.5m9.5m*9.5m38.009959#2.5626.5m*6.5m9.5m*9.5m38.0099510#3.8596.5m*6.5m9.5m*9.5m38.00129511#2.3196.4m*17m9.4m*20m58.809147南11大桥右辅道桥0#2.1816.4m*18m9.4m*21m60.8091521#2.7896.5m*6.5m9.5m*9.5m38.009952#4.6496.5m*6.5m9.5m*9.5m38.0012953#2.8906.5m*6.5m9.5m*9.5m38.009954#3.5756.5m
7、*6.5m9.5m*9.5m38.0012955#3.1146.5m*6.5m9.5m*9.5m38.0012956#3.2286.5m*6.5m9.5m*9.5m38.0012957#5.0716.5m*6.5m9.5m*9.5m38.0015958#4.0586.5m*6.5m9.5m*9.5m38.0012959#2.5726.5m*6.5m9.5m*9.5m38.0099510#3.8946.5m*6.5m9.5m*9.5m38.00129511#2.2326.4m*18m9.4m*21m60.809152南n0#3.64017.34m*6.4m20.34m*9.4m59.481214
8、3村中桥左主线桥1#3.64O17.34m*6.4m20.34m*9.4m59.4812143南n村中桥右主线桥0#3.70021.09m*6.4m24.09m*9.4m66.98121621#3.70021.30m*6.4m24.3m*9.4m67.4012162南11村中桥左辅道桥0#3.64022.34m*6.4m25.34m*9.4m69.48121641#3.64022.34m*6.4m25.34m*9.4m69.4812164南n村中桥0#3.70018m*6.4m21m*9.4m60.80121521#3.70018m*6.4m21m*9.4m60.8012152角泰路中桥左幅主
9、线桥0#2.37017.34m*6.4m20.34m*9.4m59.4891431#3.6076.5m*6.3m9.5m*9.3m37.6012942#3.3386.5m*6.3m9.5m*9.3m37.6012943#1.93717.34m*6.4m20.34m*9.4m59.489143角泰路中桥右0#2.37017.34m*6.4m20.34m*9.4m59.489143幅主线桥1#3.6076.5m*6.3m9.5m*9.3m37.6012942#3.3386.5m*6.3m9.5m*9.3m37.6012943#1.93717.34m*6.4m20.34m*9.4m59.489143
10、角0#2.37018m*6.4m21m*9.4m60.809152泰路中桥左辅道桥1#3.6076.5m*6.3m9.5m*9.3m37.6012942#3.3386.5m*6.3m9.5m*9.3m37.6012943#1.93718m*6.4m21m*9.4m60.809152角0#2.37018m*6.4m21m*9.4m60.809152泰路中桥右辅道桥1#3.6076.5m*6.3m9.5m*9.3m37.6012942#3.3386.5m*6.3m9.5m*9.3m37.6012943#1.93718m*6.4m21m*9.4m60.809152杨厝中桥左幅主线桥0#0.79017
11、.34m*6.4m20.34m*9.4m59.4891431#2.9676.5m*6.3m9.5m*9.3m37.609942#1.6406.5m*6.3m9.5m*9.3m37.609943#2.4276.5m*6.3m9.5m*9.3m37.609944#2.50017.34m*6.4m20.34m*9.4m59.489143杨0#0.79017.34m*6.20.34m*9.59.489143厝中桥右幅主线桥4m4m1#2.966.5m*6.3m9.5m*9.3m37.6099472#1.646.5m*6.3m9.5m*9.3m37.6099403#2.426.5m*6.3m9.5m*9
12、.3m37.6099474#2.5017.34m*6.20.34m*9.59.48914304m4m杨厝中桥左辅道桥0#0.79018m*6.4m21m*9.4m60.8091521#2.966.5m*6.3m9.5m*9.3m37.6099472#1.64O6.5m*6.3m9.5m*9.3m37.609943#2.4276.5m*6.3m9.5m*9.3m37.609944#2.50018m*6.4m21m*9.4m60.809152杨厝中桥右辅道桥0#0.79018m*6.4m21m*9.4m60.8091521#2.9676.5m*6.3m9.5m*9.3m37.609942#1.64
13、06.5m*6.3m9.5m*9.3m37.609943#2.4276.5m*6.3m9.5m*9.3m37.609944#2.50018m*6.4m21m*9.4m37.60994合计10420基坑开搀深度h5m时的承台基坑支护平面布置图基坑开挖深度5mh8m时的承台基坑支护平面布置图二基坑开挖深度5mh8m时的承台基坑支护立面布置图2 .主线桥梁承台基坑钢板桩支护计算2.1. 基坑开搀深度h5m时的承台基坑钢板桩支护计算(1阚南门大桥3#桥墩承台基坑支护为计算对象,基坑计算参数如下:H地面=2.055mH承台基坑底二-L485mh(基坑开挖)=3.74m(考虑超挖20cm(浇筑C20封底磴
14、)承台开挖面积:9.5m9.5m(2)r.(P按照12m范围内的加权平均值计算:各类土体计算参数(按照地表以下12m范围土体考虑):淤泥质土:hl=3.83m,rl=26.7KN/m3、l=2.6xCl=10.35kpa;粉质粘性土夹细砂:h2=4.9m,r2=26.9KNr3x2=12.3C2=29.8kpa;砂土状强风化花岗闪长岩:h3=3.27m,r3=21KNm3x3=30oxC3=30kpa;r加权平均=(rlhl+r2h2+r3h3)12=(26.73.83+26.94.9+213.27)12=25.2KNm3加权平均二(lhl+2h2+3h3)12二(2.613.83+12.3x
15、4.9+30x3.27)/12=14.1(3)钢板桩所承受的主动土压力计算Ka=tg2(45-2)=tg2(45-14.1o2)=0.608Kp=tg2(45+2)=tg2(45+14.1o2)=1.644Eah=rhKa=25.2KNm3X3.74mX0.608=57.3KNm2E叫二q挖掘机Ka=30KNm20.608Pb=Eah+Eaq=57.3KNm2+18.2KNm2=75.5KNm2yq=L5mtg(45+2)(挖掘机履带边缘距离承台基坑顶边缘按照1.5m考虑)=1.5mtg(45+14.1o2)=1.923m(4)计算土压力强度为O处(桩墙前的被动土压力二桩墙后的主动土压力)距离
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 主线 桥梁 基坑 钢板 支护 设计 计算

链接地址:https://www.desk33.com/p-676274.html