1、 .Contract for Decoration ProjectParty A (full name): Party B (full name): This Contract is concluded on the basis of the project details by and between the foresaid Party A and Party B in accordance with Contract Law of Peoples Republic of China and Construction Engineering Contract Regulations.1.
2、Overview1.1 Project name:1.2 Project site: 1.3 Project content: 1.4 Means of contract: 1.5 Construction Period is from date of commence of , to completion date of .1.6 Quality standard:1.7 Contract price:2. Party As Responsibilities2.1 Party A shall provide copy of confirmed construction drawings or
3、 instructions to Party B Days prior to the date of commence, clear up all or parts of the buildings, and remove barriers. Party A will take protective measures for the remaining furniture and furnishings. Party A also needs to provide water, electricity, gas and telecommunications, and indicate matt
4、ers needing attention to Party B. Party A will be responsible for going through all the applications and approval procedures related to the project.2.2 Party A assigns to be the representative. He will be responsible for the supervision and control over the project, and handle the acceptance, altera
5、tion, registration formalities.2.3 Party A entrusts with the construction supervision of this project. The supervision company appoints to be the general supervision engineer, clarifies his responsibilities in the supervision contract, and submits copy of the contract to Party B.2.4 Party A shall be
6、 responsible for protecting the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged, and bear corresponding costs.2.5 If it is really necessary to change the original building structure or pipelines, Party A shall be responsible for going through the corresponding
7、approval procedures.2.6 Party A will coordinate with relevant departments to do on-site security, fire protection, waste disposal, etc., and bear the corresponding costs.3. Party Bs Responsibilities3.1 Party B must be available to attend meetings organized by Party A and prepare construction plan an
8、d schedule.3.2 Party B assigns as the site resident representative. He will be responsible for construction organization and completion of the project with good quality.3.3 Party B shall strictly implement the construction specifications, safety operation procedures, fire safety regulations, and env
9、ironmental protection regulations. It muststrictlyexecuteconstructionabidingby construction drawings or practice instructions, and complete the quality inspection record. Party B must participate in the final completion acceptance, and prepare the project settlement.3.4 Party B must abide by the pro
10、visions on the management of the construction sites by the national or local government and related departments, protect the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged. Party B also need to do a good job in such things as the construction site security and
11、 garbage disposal, and deal well with the issue of disturbing residents brought about by construction.3.5 Without Party As consent or approval of relevant departments, Party B shall not make any unauthorized changes to original building structure or pipelines.3.6 Party B shall be responsible for pro
12、tecting all the facilities and finished projects before the project is handed over to Party A.4. Construction Period4.1 When Party A needs to complete the project ahead of the time limit, it should obtain Party Bs agreement and pay the cost for the measures that Party B takes to crash the schedule.
13、4.2 If the project progress is influenced by the delay of Party As delivery date, the practically impacted cycle extends accordingly.4.3 If the project can not be started on time or shutdown halfway for no reason because of Party Bs responsibility, the practically impacted cycle can not extend accor
14、dingly. 4.4 The project duration shall be prolonged when the downtime is over eight hours (accumulated in one week) caused by the power failure, water failure, gas stop and force majeure factors because of design changes or reasons not related to Party B. 5. Quality Standard and Acceptance Inspectio
15、n5.1 This project takes construction drawings, instructions, design changes and national construction and acceptance specifications such as Construction and Acceptance Standards of Decoration Engineering (JGJ73-91), Unified Quality Inspection and Assessment of Architectural Installation Work (GBJ300
16、-88) as quality assessment and acceptance standards. 5.2 Quality of the project should meet the acceptance criterion of national quality assessment. If all or parts of the project reach to the excellent standard, Party A will pay to Party B increased costs.5.3 Party A and Party B shall promptly hand
17、le the concealed work inspection procedures of pre-acceptance in the middle of the project. If Party A do not organize covert acceptance in time, Party B can make self-inspection and Party A shall admit the result. If Party A requires the re-inspection, Party B shall be in accordance with the requir
18、ements for the re-inspection. If the re-inspection result is acceptable, Party A shall bear the re-inspection fee and the project duration can be extended accordingly; if re-inspection result is not acceptable, the re-inspection and reworking costs shall be borne by Party B, and the project duration
19、 shall also be extended accordingly. 5.4 If materials provided by Party A for the construction do not meet the necessary requirements, Party A shall bear responsibility for any resulting delays in the completion of the project.5.5 If the quality of Party Bs work results in any accidents, liability f
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程 建筑 装饰 工程施工 合同 英文 ContractforDecorationProject
链接地址:https://www.desk33.com/p-7361.html